RCCAs to Diablo Canyon

Framatome Cogema Fuels (FCF) was selected by PG&E to supply 106 rod cluster control assemblies (RCCAs) to the Diablo Canyon Nuclear Plant. The RCCAs will have the Ion-Nitride wear protection feature developed by Framatome in France. The selection for FCF’s RCCA design, which follows last year’s award by Florida Power & Light for replacement RCCAs for the Turkey Point reactors, provides further confirmation of the benefits of the Harmoni™ Ion-Nitride RCCAs. Deliveries to Diablo Canyon are scheduled to occur over two cycles at each plant, with the first delivery scheduled for March 2001.

 

The data herein are solely for your information and are not offered, or to be construed, as a warranty or contractual responsibility.
© 2000 Framatome Technologies. All Rights Reserved.